<?xml version="1.0" encoding="ISO-8859-1"?>
<!-- generator="Acolyte FeedCreator" -->
<rss version="2.0">
    <channel>
        <title>MFR Solution aquatique</title>
        <description>MFR Solution aquatique :: Bussiness news</description>
        <link>http://mfr-aqua.com/Fil-de-nouvelles</link>
        <lastBuildDate>Wed, 13 May 2026 07:34:27 -0400</lastBuildDate>
        <generator>Acolyte FeedCreator</generator>
        <item>
            <title>New Sports Complex in Gatineau</title>
            <link>http://mfr-aqua.com/news/2008-09-25/New-Sports-Complex-in-Gatineau/10</link>
            <description><![CDATA[<p>The construction project for the future Gatineau Sports Complex was awarded to Decarel Inc. Decarel subcontracted the manufacturing and installation of the movable floor to MFR. Among other things, MFR will provide the Natare bulkhead for the 50m pool and a sparger system for the diving towers.</p>
<h4 class="blue1">Project Timeline :</h4>
<p><br /><strong>September 2008 - June 2009</strong></p>]]></description>
            <author>MFR Solution aquatique</author>
            <pubDate>Thu, 25 Sep 2008 04:00:00 -0400</pubDate>
        </item>
        <item>
            <title>Claude-Robillard Sports Complex</title>
            <link>http://mfr-aqua.com/news/2008-09-25/Claude-Robillard-Sports-Complex/9</link>
            <description><![CDATA[<p>MFR was awarded the contract to repair the pool's floor, bulkhead and control system (hydraulic unit, control console and depth display).</p>
<h4 class="blue1">Project Timeline :</h4>
<p><br /><strong>June 2008 - Mars 2009</strong></p>]]></description>
            <author>MFR Solution aquatique</author>
            <pubDate>Thu, 25 Sep 2008 04:00:00 -0400</pubDate>
        </item>
        <item>
            <title>Université de Montréal (CEPSUM)</title>
            <link>http://mfr-aqua.com/news/2008-09-25/Universit---de-Montr--al--CEPSUM-/11</link>
            <description><![CDATA[<p>The diving pool and 50m swimming pool liners are being replaced with ceramics. MFR Inc. is in charge of managing the pool's movable floor and bulkhead for the work project (dismantling and storage).</p>
<h4 class="blue1">Project Timeline :</h4>
<p><br /><strong>August 2008 - February 2009</strong></p>]]></description>
            <author>MFR Solution aquatique</author>
            <pubDate>Thu, 25 Sep 2008 04:00:00 -0400</pubDate>
        </item>
    </channel>
</rss>
